The number of dredgers has increased to three in The Turkmenabad production Association “Deryaellars” of the Agency “Turkmendengizderyaellars”.
This became possible after the completion of work on repairing another dredger in the production area for the repair and construction of ships. The GS-6 dredger of the LS-27 project is now ready for launching into the water. Its capacity is designed to deepen and clear of silt 120 cubic meters per hour.
Currently, one of the dredgers is operated near the pontoon crossing over the Amu Darya “Pelvert-Mekan”, the other — in the Berzeng canal.